Shunan EIFS dry base coat

FOB Reference Price:Get Latest Price
US $6.5-12.5 / Bag | 1 Bag/Bags (Min. Order)
Supply Ability:
2800 Bag/Bags per Day
Port:
Shanghai
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Shanghai, China (Mainland)
Brand Name:
shunan
Model Number:
SA802
Usage:
Joint Mortar
Type:
Cement Mortar
Quality Management System:
ISO 9001:2008
Main components:
Cement, sand, emulsion polymers,cellulosic rheology modifiers
Application:
energy-efficient exterior insulation and finish systems (EIFS)
Packaging & Delivery
Packaging Details
In 25kg (55lbs) bag
Delivery Time
3 days

Shunan base coat render of EIFS

Description

Dry-mix.polymer base coat containing Portland cement, and requiring only water for mixing.

 

PRODUCT INFORMATION

PRODUCT PACKAGING

• Weight: 25kg

• Color: Natural cement grey

• Shelf life and storage: 6 months after manufacturing date in dry ventilated place

• Standard: JG149-2003

• Storage: unopened bag on plate in dry place

• Production date & batch number: find on outside of bag                                                  

 

Water addition

0.22 liter/ kg powder (5.5 L of Water for 25 kg of mortar)

 

Field of application

The function of this product is to protect the XPS board and fix the mesh. The finishing coat can be tile or plater, paint etc...

A comprehensive line of base coats used to embedded mesh, trowels easily, speeds mesh embedment,
reduces applicator arm fatigue, increases job site productivity..

 

Consumption

4.5 ~ 6 kg/m2

 

Technical Data

 

 

Tensile Adhesive Strength, Mpa

(with foamed polystyrene)

Original

≥ 0.10

(polystyrene board damaged)

Water resistant

≥ 0.10

(polystyrene board damaged)

Freeze - thaw resistant

≥ 0.10

(polystyrene board damaged)

 

 

Flexibility property

Compressive strength/ flexural %

(cement based)

 

≤ 3.0

Cracking strain % (non cement base )

≥ 1.5

Processing/working time h

1.5~4.0

 

Tools

electric-mixer, trowel, bucket

 

Substrate requirement

1) Polystyrene board must be clean (no dust or dirt)

2) Polystyrene board must be fixed stably (Wait min 24h before applying shunan. therm epsad)

3) The surface of the whole polystyrene board  wall must be level
 
Preparation
• Polystyrene board must be fixed stably

• Make sure the whole polystyrene wall is flat

 

Working Place For Villa In Shanghai

 

 

 

Remarks

1) Only mix with water, no other addition

2) The temperature of air and glue must be from 5°C~35°C 

3) The glue must be used up in 2h

4) Avoid sunshine, high temperature and freezing

5) Avoid strong wind during application

6) Avoid rain during application

 
Safety
1) May cause serious damage to eyes
2) May be sensitive to skin in case of contact. lrritable for eyes, respiratory system and skin
3) Keep out of the reach of children
4) Avoid breathing the dust
5) In case of contact with eyes,rinse eyes immediately with plenty of water and consult a doctor
6) Wear suitable protective clothing,gloves and eye/face protection 
 
External Insulation and Finishing Systems (EIFS)