Exterior Wall (Leveling) Putty

FOB Reference Price:Get Latest Price
US $4.5-8.5 / Bag | 1 Bag/Bags (Min. Order)
Supply Ability:
5000 Bag/Bags per Day
Port:
Shanghai
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Shanghai, China (Mainland)
Main Raw Material:
Other, Good quality white cement, flexible polymer and hydrophobic additives
Usage:
Building Coating
Application Method:
Brush
State:
Powder Coating
Brand Name:
Shunan
Model Number:
SA-824
Product Name:
white cement based wall putty
Initial setting time:
< 5h
Type:
Paint wall putty
Color:
White/grey
Appearance:
Fine Powder
Feature:
Good compatibility with exterior finish coat, long Lasting
Application:
Exterior Decoration
Wall putty bag:
25kg
Application method:
Brush or spray
Packaging & Delivery
Packaging Details
Shun finish wall putty packaging: 25kg paper sacks, OEM package is available
Delivery Time
Shunan wall putty leading time: 2 days

Shunan SA824 Water Proofing Exterior Wall Putty

Product Description
Shunan exterior wall filler is a one component,  polymer-mineral, preblended, cementitious outdoor wall plaster which, when mixed with water,is used prior to the application of finish coating. Durable fillers, fill cracks and splits on exterior surfaces.
 
Advantages

 · Easy to use, just mix it with water

· Excellent weather resistance

· Good application ability, easy to apply and polish

· Good water-resistant and water vapour transmission ability

· High adhesive strength

· Good match with substrate and finish coating

· ISO9001 quality management system

· Green building material certificate

National Standard

JG/T229-2007 

 

Product Uses

 · Suitable substrates: cement mortar, concrete

·  Exterior for building 

·  To be used for preparation of concrete, cement-lime and brick substrate before finishing. 

·  May be used for filling small cavities, cracks and voids up to 5 mm deep.  After drying up, building façade may be painted. May be used for inside finishing as well, including in humid areas (bathrooms, saunas, kitchens, etc.)

 

Technical Data

 

 
Tools:

Elec-mixer, Bucket, Trowel

Surface Preparation

 · Clean the substrate until free from dust, oil, or any other stains

·  When high temperature season or dry substrate, substrate should be wet one day before

 

Applications

 · Put 8.25 liters clean water in a bucket. Gradually add one bag (25 kg) of powder into water

· Mix properly until homogeneous and lump-free

· Leave the product for 5~10 minutes. Then mix the second time for 1~2 minutes

· Apply the 1st coat of product onto the substrate. When the finish is dry, apply the 2nd coat.      Each thickness is about 0.5 ~0.6 mm

 Ensure a flat, smooth and pinhole free coating

· Normally, after 24 hours (depend on weather and substrate), polish the surface

  After that, apply the finish coating

Notes

 · Avoid rain, high temperature and frost

· Avoid direct sunlight or strong wind

· May cause serious damage to eyes

· May be sensitive to skin in case of contact. lrritable for eyes, respiratory system and skin

· Keep out of the reach of children

· Avoid breathing the dust

· In case of contact with eyes,rinse eyes immediately with plenty of water and consult a doctor

· Wear suitable protective clothing,gloves and eye/face protection